Datacentre Power Testing
Scheduled for Jun 18, 07:00 - 11:00 BST
Scheduled
During this period we will be performing a load transition onto the generators.

This forms part of our maintenance schedule to ensure that our backup systems will cope with the load.

Power will be transitioned onto the generators for a period of time before being transitioned back to mains again.

All UPS protected equipment should not experience any power loss however this should be considered an at-risk period.
Posted 6 days ago. Jun 10, 2019 - 13:16 BST
This scheduled maintenance affects: Data Center Power Status.